SE23.com - The Official Forum for Forest Hill & Honor Oak, London SE23
Online since 2002

Home | SE23 Topics | Wider Topics | Offered/Wanted/Lost/Found | About SE23.com | Advertising | Contact | |
Canvas & Cream  Armstrong & Co Solicitors



Post Reply  Post Topic 
Upcoming Rail Engineering Works Update thread
Author Message
rbmartin


Posts: 1,253
Joined: Nov 2007
Post: #1
10-01-2023 03:09 AM

Saturday 14th January:

Southern: No service except for the 0558 and 0628 to London Bridge, plus the 2358, 0020 and 0035 from London Bridge. A replacement bus service from Victoria leaves at 2356 arriving at 0128. The 185 is a faster option at that time.

London Overground: Normal service.

Southeastern (Hayes line): Normal service.

Thameslink (Crofton Park/Catford): Blackfriars to Sevenoaks only.

Sunday 15th January:

Southern: No service.

London Overground: Normal service.

Southeastern: Normal service.

Thameslink: Early morning services diverted to Victoria. First train to Blackfriars at 0914.

This upcoming Thursday January 12th, the Elizabeth line between Abbey Wood and Paddington will be closed for industrial action, so there will be no interchange between the Overground and the Elizabeth line at Whitechapel. Tube services from Whitechapel and Canada Water will operate normally.

Find all posts by this user Quote this message in a reply

Friends of Blythe Hill Fields


Messages In This Topic
RE: Upcoming Rail Engineering Works Update thread - rbmartin - 10-01-2023 03:09 AM

Possibly Related Topics ...
Topic: Author Replies: Views: Last Post
  Rail engineering works stepover 30 48,995 01-04-2015 07:47 PM
Last Post: Erekose
  Engineering Works Sherwood 0 5,033 02-01-2013 07:45 PM
Last Post: Sherwood
  Engineering works on the trains this weekend michael 0 5,808 11-09-2008 07:47 PM
Last Post: michael
  Rail engineering works: 26/27th April 2008 blushingsnail 7 16,237 12-05-2008 09:01 AM
Last Post: blushingsnail