SE23.com - The Official Forum for Forest Hill & Honor Oak, London SE23
Online since 2002

Home | SE23 Topics | Wider Topics | Offered/Wanted/Lost/Found | About SE23.com | Advertising | Contact | |
Canvas & Cream  Armstrong & Co Solicitors



Post Reply  Post Topic 
Upcoming Rail Engineering Works Update thread
Author Message
rbmartin


Posts: 1,276
Joined: Nov 2007
Post: #1
30-08-2023 08:03 PM

Saturday 2nd/Sunday 3rd September:

Forest Hill/Honor Oak Park: No service on Southern due to an overtime ban on Saturday but will operate on Sunday, normal service on London Overground throughout.

Catford Bridge/Lower Sydenham: No service on Saturday, on Sunday trains are once again diverted to Blackfriars, not calling at London Bridge, Waterloo East and Charing Cross.

Crofton Park/Catford: On Saturday a reduced service of one train per hour between Blackfriars and Sevenoaks. The last train from Blackfriars is at 1716. Sunday service is normal with the exception of early services to Victoria terminating at Blackfriars.

Find all posts by this user Quote this message in a reply

Dynamite Websites £49 per month


Messages In This Topic
RE: Upcoming Rail Engineering Works Update thread - rbmartin - 30-08-2023 08:03 PM

Possibly Related Topics ...
Topic: Author Replies: Views: Last Post
  Rail engineering works stepover 30 51,523 01-04-2015 07:47 PM
Last Post: Erekose
  Engineering Works Sherwood 0 5,297 02-01-2013 07:45 PM
Last Post: Sherwood
  Engineering works on the trains this weekend michael 0 6,105 11-09-2008 07:47 PM
Last Post: michael
  Rail engineering works: 26/27th April 2008 blushingsnail 7 17,046 12-05-2008 09:01 AM
Last Post: blushingsnail