SE23.com - The Official Forum for Forest Hill & Honor Oak, London SE23
Online since 2002

Home | SE23 Topics | Wider Topics | Offered/Wanted/Lost/Found | About SE23.com | Advertising | Contact | |
Canvas & Cream  Armstrong & Co Solicitors



Post Reply  Post Topic 
Upcoming Rail Engineering Works Update thread
Author Message
rbmartin


Posts: 1,253
Joined: Nov 2007
Post: #1
03-08-2025 01:24 AM

Saturday 9th and Sunday 10th August.

Forest Hill/Honor Oak Park: Normal service on Southern and the Windrush line except for the final service from Victoria will depart at 2359 instead of 2320 on Saturday.

A reminder that from Monday 11th to Thursday 14th that the Windrush line won't operate between New Cross Gate and Highbury & Islington during late evenings.

The final through service from Highbury & Islington is at 2132, Whitechapel at 2145 and Canada Water at 2153. After this time use London Bridge or Victoria to travel back on Southern. The last train from Victoria is 2320 and London Bridge at 0035.

The last Windrush line train through to Canada Water and Whitechapel from Forest Hill is the 2117 to Dalston Junction.

Windrush line services will operate between New Cross Gate and Crystal Palace/West Croydon until end of service.

Catford Bridge/Lower Sydenham: Normal service.

Crofton Park/Catford: Normal service.

Find all posts by this user Quote this message in a reply

Friends of Blythe Hill Fields


Messages In This Topic
RE: Upcoming Rail Engineering Works Update thread - rbmartin - 03-08-2025 01:24 AM

Possibly Related Topics ...
Topic: Author Replies: Views: Last Post
  Rail engineering works stepover 30 48,966 01-04-2015 07:47 PM
Last Post: Erekose
  Engineering Works Sherwood 0 5,033 02-01-2013 07:45 PM
Last Post: Sherwood
  Engineering works on the trains this weekend michael 0 5,807 11-09-2008 07:47 PM
Last Post: michael
  Rail engineering works: 26/27th April 2008 blushingsnail 7 16,233 12-05-2008 09:01 AM
Last Post: blushingsnail